-
I wish i was that far ahead, the bottom is still painted (Gray), but the power wash took most of it off. It will need a couples hour's prep for paint some time this winter. It was the frame for the cover that consumed a good part of the day. The frame is just 1/2" pvc conduit, really it's just a shelter from rain & wind, as we never see the snow load you probably get in Maine.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules