Work on Bisquit continues. I took a break to do the Transpac and the boat I sail on dropped out. - something about Hurricane Delores and insurance. Kinda glad we didn't go. It is a slow one this year. That is a story for another time. Back to the grind -- literally. Now that the deck is faired, it is time to move to the cabin top. I replaced the core under the mast step with solid glass and redesigned the mast step in solid glass. I also replaced the core on the cabin top at the starboard cockpit. I plan to run the halyards aft to clutches and a winch on both sides. The pt side is dry so need to re core. I'll lay glass tomorrow and start the fairing of the cabin top. My goal is to have primer on the deck by the end of the month. We will see how it goes.

Name:  2015-07-24-15.48.43.jpg
Views: 2448
Size:  28.7 KB

Name:  2015-07-24-15.48.56.jpg
Views: 2478
Size:  23.8 KB

Name:  2015-07-20 18.02.52.jpg
Views: 2534
Size:  68.4 KB

Name:  2015-07-20 18.02.36.jpg
Views: 2515
Size:  64.7 KB