Mike it was a combination of drawing and show and tell
Here are the drawings I gave him.
I also gave him a full scale profile of the mast section so he could tell how to bend the plates that hold the assembly in the mast. My drawing does not show it but I had him drill and tap for the 6 screws where the two loose plates that lock it into the mast attach to the welded stainless assembly. Tapping the stainless is a lot easier when someone else does it.
BTW I ended up going to a larger diameter sheeve than the Harken one I first bought. I ended up using the Ronstan RF1767 sheeve that has just shy of 2" diameter.
The fabricator I used was a company called Day Metal Products and I dealt with the owner who's name is Bobby Day. The Company is located in Brooksville, FL and the phone number is 352-799-9258.
Tell Bobby that if he does not have enough information in his file to build yours that he can call me and I will bring my parts back to him to use as a sample.
Also one thing I would do differantly if doing it over the plate on the aft side of the mast that locks the assembly into the mast should have longer legs on it to get the screws further away from the slot in the mast. On mine they bottomed out on the welded assembly so I had to add some washers to pull everything tight.
Last edited by Commander 147; 05-01-2012 at 03:21 PM.
Reason: additional information
JERRY CARPENTER - C147
A man can succeed at almost anything for which he has unlimited enthusiam.