I installed the Schaefer 750 furler dockside in 2004. The biggest problem we puzzled over was settling on a path for furling line back to the cockpit. Ultimately, the routing you see below emerged. At the cockpit coamings, the line passed through a 3/4" copper fair lead. The furler works great with the 100%. With the rope luffed 130% it's probably a bit small... time for more thinking....