+ Reply to Thread
Results 1 to 15 of 472

Thread: EBB's PHOTO GALLERY THREAD

Hybrid View

  1. #1
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "Showing the end on the new toerail and a transom begging for a taffrail!"
    Attached Images  

  2. #2
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "Curtains and runs from a disastrous spray-on primer fiasco. Expectations were of a thin easy to sand final prime. Even paid the guy for his time. And yours truly spent the hottest days on record in San Rafael longboarding and sanding the damn stuff nearly all off!"
    Attached Images  

  3. #3
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "Port scuppers cut into the molded rail under the new toerail just forward of the Pearson deck scupper. Whether this is the place for them is arguable. They are also near the winch base and will constrict water flow on its way aft. It is way more traditional to have scuppers evenly spaced along the bulwark."
    Attached Images  

  4. #4
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "Portrait of the port side toerail"
    Attached Images  

  5. #5
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "Finally the OB motor well gets its primer coat, albeit lots of runs, but relatively easy to sand. Wish I could get somebody else to do it!"
    Attached Images  
    Last edited by Bill; 08-01-2006 at 09:30 AM.

  6. #6
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "This shows the dodger from the cockpit. The piece is made from xmat and epoxy over a form. 1/2-inch pvc foam was bent and glued to that and more xmat on top. Classic sandwich. Works in progress have many unknowns and surprises. How it will actually finish up can't tell (ideas, anyone?) - or even if it will have a place there aesthetically. Unlike Geoff, who has the area covered, the dodger proposed here is only a windscreen requiring an expensive pipe and canvas pram hood to fully protect the c'way. Dodger has its own bridge over the c'way making it independent of the seahood. There's a choice whether it will be permanently installed or made removable. Picture shows the big side hatch-slide rails now built in. They run the length of the cabin top and the seahood (also removable) mounts there on. Note taller coamings extending up from the inside and the mockup of a flat hatch."
    Attached Images  

  7. #7
    Join Date
    Sep 2001
    Location
    Orinda, California
    Posts
    2,311
    Ebb: "This shot shows the seahood made with the original sliding hatch. There may be room under the forward part for a dorade. Dodger shows some off-the-wall possible windows. I had planned 3/8" carbonate for these - but bending the plastic to those curves is totally daunting. Center window indicates a Taylor-Made opening hatch."
    Attached Images  

+ Reply to Thread

Similar Threads

  1. A-228 - GEOFF's AUSSIE PHOTO GALLERY
    By Bill in forum Gallery
    Replies: 167
    Last Post: 05-10-2017, 05:31 AM
  2. Portrait Gallery
    By ebb in forum Gallery
    Replies: 5
    Last Post: 10-09-2005, 08:51 AM
  3. MALISZEWSKI'S PHOTO GALLERY
    By Bill in forum Gallery
    Replies: 7
    Last Post: 07-25-2003, 08:56 AM
  4. Photo Attachments - Bigger isn't always Better!
    By Dan Maliszewski in forum General/Off-Topic
    Replies: 2
    Last Post: 01-06-2003, 09:13 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts