+ Reply to Thread
Results 1 to 15 of 90

Thread: STRONGBACK DISCUSSION etc.

Hybrid View

  1. #1
    Join Date
    Sep 2001
    Location
    San Rafael, CA
    Posts
    3,621
    9/10/2021
    A couple of observations from the future. Please excuse repetitions!

    In short, my laminated beam across the cabin has no other support
    except for the overbuilt gussets at the chainplates at the center shroud.
    I laid in a substantial floor (Cross piece timber) at the step up into the
    front cabin. Which in Litlgull no longer exists because the bulkhead
    is removed (forward as a 'crash bulkhead').

    I recorded the height from the floor timber to the bottom of the
    laminated beam. But then I read that the tanins in white oak may react
    with the resorcinol.. So I thru-bolted the whole thing to the cabin top
    with bronze carriage bolts. Measured the height with mast and rig and
    found barely 1/8" less. Seems OK. The unitized laminate, bolted and
    glued up-graded deck (balsa replaced with solid frp), immovably supports
    the mast with all its active downward pressure. We'll see! And, just in
    case, a compression post, like the Commander's, could easily slip in
    between the cross-floor and the cross-beam.
    Someone here pointed out a pole in the middle of the accommodation
    isn't a bad thing -- you use it to swing around or just as a steady-hold in
    an often very active little ship..

    That's A338. Our discussion here finds that the problem with the strong
    back is not rot but the settling of the dry fitted pieces under rig pressure
    over time.

    For those skippers restoring their Ariels, I would suggest removing the
    main bulkhead. Put in a substantial floor across the bottom at and as the
    step up. Block the crossbeam into its final position if it's in good shape.*
    Might GLUE it to the cabin top with rubber cement (4200). Then reframe
    the passage way with substantial posts to support the venerable beam.
    Thus we have the hull and cross-floor supporting the strongback. Finish
    the bulkhead in an interesting plywood of your choice. Doorway can be
    kept open with a privacy curtain for air circulation.
    *May have to return the mast-DECK to its original curve with a jack -- and
    repair any balsa-rot. If I remember the balsa is 3/8". Remove the deck
    laminate carefully. Replace rot with glass mat and glue the deck back on.

    Hope this still holds true: You cannot find a better marine plywood to
    sheathe the bulkhead than BS1088 Meranti. It is made with phillipine-like
    mahoganies and bonded under high pressure with phenolic glue. The
    veneers are knotless thruout, panel is flawless and deadflat. Could get
    by with the 6mm but 9mm will allow left overs for shelves and such. Easy
    to varnish or paint.

    This will provide all necessary support for the beam and rig overhead
    forever. IMCO
    Last edited by ebb; 09-27-2021 at 01:06 PM.

+ Reply to Thread

Similar Threads

  1. All those wires inside my mast gotta go!
    By Scott Galloway in forum Technical
    Replies: 26
    Last Post: 07-04-2007, 07:40 AM
  2. Commander- replace mast support with cross beam
    By beugenides in forum Technical
    Replies: 2
    Last Post: 01-11-2005, 12:04 PM
  3. Tabernacle Operation
    By Scott Galloway in forum Technical
    Replies: 17
    Last Post: 09-04-2003, 08:56 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts