Results 1 to 15 of 90

Thread: STRONGBACK DISCUSSION etc.

Threaded View

  1. #11
    Join Date
    Mar 2006
    Location
    Havre de Grace, MD
    Posts
    207
    I dout there would be much waste, the arch wouldn't have to be continuos per ply, just dont pile up the joints in line with each other, the glue is stronger then the wood anyhow. If I were to do it I'd likely do it in 1/3 - 1/2 - 1/3 . . . plys put em in a vac bag, and wala. If you wanted to over kill the joints, scarf them.

    Edit: As Frank mentioned the Tj's (the osb capped by dim lumber) can and do span further and hold more weight on the longer span then their relitively sized solid wood joists.
    Last edited by tha3rdman; 08-19-2006 at 06:53 AM.
    #97 "Absum!"

Similar Threads

  1. All those wires inside my mast gotta go!
    By Scott Galloway in forum Technical
    Replies: 26
    Last Post: 07-04-2007, 07:40 AM
  2. Commander- replace mast support with cross beam
    By beugenides in forum Technical
    Replies: 2
    Last Post: 01-11-2005, 12:04 PM
  3. Tabernacle Operation
    By Scott Galloway in forum Technical
    Replies: 17
    Last Post: 09-04-2003, 08:56 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts