Ed,

Thanks for the heads up. I may have the same problem with inboard sheeting points for the #2, that is, the leach of the sail overlapping the spreader tips. My #2, however, is more like a 118%, but I do think it still overlaps the spreader. I was already thinking I would lead the sheet between the shrouds, but if it overlaps the spreader, this is not a solution....We'll see in the spring.

The working jib originally was lead forward of the forward lowers, and shroud rollers were installed on said lowers. The sheets rolled on them and the clew came right to the roller when close hauled. I never brought it inside that since it had sheet blocks installed at the clew which made it difficult. (That was before I installed winches.)