+ Reply to Thread
Results 1 to 15 of 16

Thread: Commander 89

Hybrid View

  1. #1
    Join Date
    Apr 2015
    Location
    Chicago, IL
    Posts
    133
    Good luck. Looks like you have lots of projects ahead. They will all be worth it. The Commander is a great boat.

  2. #2
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17
    What tool do I use to cut the top layer of deck off so I can replace rotted core?

    How do I make the cut so I don’t cut the core below, but just the fiberglass skin?

  3. #3
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17

    Deck repair

    Need some advice on how to cut into the deck to repair the core
    Attached Images  

  4. #4
    Join Date
    Apr 2015
    Location
    Chicago, IL
    Posts
    133
    I use a Dremel saw with the blade sit to 1/4" deep. Be careful not to cut too close to the toe rail. The outer skin and inner skin join there. I've attached a photo so you can see what I mean. Here is a link to a dropbox with a bunch of pictures of my deck recore project.
    https://www.dropbox.com/sh/88ftelcej...rmwx9RYba?dl=0

    Name:  2015-04-29 19.44.14 (1).jpg
Views: 2967
Size:  65.7 KB

  5. #5
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17
    Thanks Phil. I’ve spent time looking at your restoration to try to absorb some of your expertise. Inspiring work by you and a bunch of others on here

  6. #6
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17

    New hardware

    I modernized some of my hardware. A single Spinlock XAS and Lewmar 7 on each side. The Spinlock were from my local marine consignment store and the Lewmars were from eBay. The original halyard setup on the Commander had terrible angles.
    Attached Images  
    Last edited by Madman; 03-19-2019 at 09:22 PM.

  7. #7
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17

    New mainsail

    From precision
    Attached Images  

  8. #8
    Join Date
    Jul 2018
    Location
    Oxnard, CA
    Posts
    17

    Re-coring project

    Finally got started on this projectName:  C9E5B3A3-FED9-4180-9EC6-FE26362AA82E.jpg
Views: 2533
Size:  72.3 KBName:  0068D568-1CDD-45B2-A4D6-A70181129E79.jpg
Views: 2432
Size:  97.5 KBName:  2F1EBFD4-41EB-403F-8EAC-128C7F0E7ABF.jpg
Views: 2419
Size:  89.2 KB

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts