Working on the rig now. I stripped all the hardware off and and modifying the masthead to accept modern exit boxes. All of the halyards will be run internally.

Name:  2016-04-19 11.50.10.jpg
Views: 2717
Size:  62.6 KB

Name:  2016-04-20 17.05.10.jpg
Views: 2653
Size:  46.2 KB

Name:  2016-04-19 11.50.26.jpg
Views: 2606
Size:  64.2 KB

I welded in some aluminium bar stock into the existing sheave box opening, ground it flush and then fitted some really nice Harken sheave boxes I scavenged from a Mumm 36 rig that got on the wrong side of a semi truck. In fact, 70 - 80% of the hardware on this boat has been scavenged from totaled boats or masts. The remainder I picked up on e-bay. Getting the hardware off was a barrel of laughs. I think I broke 5 or 6 impact driver bits even though I soaked all of the fasteners with PB blaster and Kroil. I removed the external bronze main track but will reinstall it after the mast is painted and slide a Tides Marine Strong System over it. I hope to get primer on the mast, boom & spin pole tonight.