This thread is dedicated to photos of Ebb's refurbishing of Ariel #338.
This thread is dedicated to photos of Ebb's refurbishing of Ariel #338.
The first photo is of Ebb's garage. Note the conveniently placed tow vehicle near the door![]()
Last edited by Bill II; 12-19-2002 at 08:34 PM.
Inside the garage . . .
Last edited by Bill II; 12-19-2002 at 08:36 PM.
Here is the replacement straongback as seen from the main cabin.
Last edited by Bill II; 12-19-2002 at 08:37 PM.
Another view of the sb construction:
Last edited by Bill II; 12-19-2002 at 08:39 PM.
Another of the SB
Last edited by Bill II; 12-19-2002 at 08:40 PM.
Last SB photo
Last edited by Bill II; 12-19-2002 at 08:42 PM.
Oops, forgot the support photo . . .
Last edited by Bill II; 12-19-2002 at 08:44 PM.
Reinforcing under foredeck
Last edited by Bill II; 12-19-2002 at 08:45 PM.
New knee for the forward chainplate. Note the old Pearson tab inside the new structure.
Last edited by Bill II; 12-19-2002 at 08:47 PM.
Looking aft at the starboard cockpti locker from the main cabin. Black pipe is new cockpit drain.
Last edited by Bill II; 12-19-2002 at 08:48 PM.
The cockpit drains exit through the new holes each side of the ob well.
Last edited by Bill II; 12-19-2002 at 08:50 PM.
This is a "shelf" built under the forepeak bunk (gone). Custom water tanks are planned for port and stbd.
Last edited by Bill II; 12-19-2002 at 08:51 PM.
Well, that was the first of the series. Stay tuned. In about a month we will have more photos. If you have questions, please ask Ebb. All of this is way out of my area of expertise.![]()
Holy Moley!
Ebb you have been busy. That is going to be one stiff boat.
Very nice workmanship.
Let me know if you need some new chainplate bolts. I have some extra silicone bronze screws, nuts and washers. The screws are a half inch longer than the original ones.