Results 1 to 15 of 422

Thread: Commander 147

Threaded View

  1. #11
    Join Date
    Sep 2008
    Location
    Brooksville, FL
    Posts
    720

    Mast raising

    Stepped the mast this weekend so we could adjust the old shrouds, mark them and then use them for the pin to pin dimensions to make the new ones. I already have the new material here with swaged fittings for the top and mechanical fittings for the bottom and all of the shrouds were left long so once I got to this stage I could measure and make them up. So for the standing rigging it is finally show time!


    You will notice the boom is installed close to the bottom of the mast. I designed the vang attachments to the same size as the gooseneck so that when I was lifting the mast I could put the boom closer to the bottom of the mast to make the baby stays work correctly.


    Oh and a special thanks to my good friend Tom Scott who drove just over 2 hours each way to spend the day and help me with this process! Friends like that are hard to come by but I am lucky enough to have two of them. My other friend Tim who lives in Iowa but visits Florida frequently comes her to help also.
    Attached Images    
    Last edited by Commander 147; 01-05-2015 at 12:11 PM. Reason: additional thanks
    JERRY CARPENTER - C147
    A man can succeed at almost anything for which he has unlimited enthusiam.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts