Old and New compression post side by side comparison
Here's a few views of the old and new post that will be going in Ceili. I opted to deviate from Pearson's threaded flange and instead had the machine shop mill a recess into the lower side of the new flange before inserting and welding it permanently to the new pipe. Obviously this wouldn't work if one wanted to retain the ability to run wiring down through the post and into the bildge. I myself have elected to not to, and will route wiring differently.
Of note, to my knowledge, Pearson never offered a vhf coaxial cable up the mast, only wires for the "steaming" light. How they made the hole in the pipe is of interest to me, not that I'll be doing the same, but it looks like it was a burn through like that which I could do with a welding rod.
Respectfully,
Chance Smith
(Formerly) Sea Sprite 23 #760 (Heritage)
(Formerly) Commander #256 (Ceili)