+ Reply to Thread
Results 1 to 15 of 619

Thread: Fruits Of My Labor (A-113)

Hybrid View

  1. #1
    Join Date
    Sep 2001
    Location
    Northern MN
    Posts
    1,100
    ...here's the bottom sides getting sealed with epoxy...
    Attached Images  

  2. #2
    Join Date
    Sep 2001
    Location
    Northern MN
    Posts
    1,100
    ...and here's how they fit together...
    Attached Images  

  3. #3
    Join Date
    Sep 2001
    Location
    San Rafael, CA
    Posts
    3,621

    Exclamation

    Go for it, Tony, nice work.
    Be interested to see what that upper step becomes. Guess you're partially closing off the V-berth 'aisle' for stowage?

    What is it they say?
    "A remodel of a thousand angles begins with a single piece of ply."

    Gorgeous prep on the hull!!!
    Last edited by ebb; 07-17-2005 at 07:40 PM.

  4. #4
    Join Date
    Jul 2004
    Location
    Winyah Bay, SC
    Posts
    607
    Tony -

    Do you take photo requests? I'd like to see what shape you settled on for the opening through the bulkhead... I really liked the rounded-corners one that you had prototyped in cardboard back many pages ago.

    Also, I'm thinking that I am going to sell my window frames, and go with Lexan bolted on from the outside. Probably too late for you to be interested in them, but I thought I'd mention it in case your molding hasn't progressed too far, or if you run into troubles with it (which I hope you don't! I considered doing something similar a while back...).

    She's looking reeeaaalll nice.
    Kurt - Ariel #422 Katie Marie
    --------------------------------------------------
    sailFar.net
    Small boats, long distances...

  5. #5
    Join Date
    Sep 2001
    Location
    Northern MN
    Posts
    1,100
    I'll take a picture of anything!!! We're currently leaning towards the same shape on the top of the passageway and a flat foothold on the bottom. After stumbling through there so many times working in the v-berth I think a moving target may be even harder for me. Man, old age s****s!

    As of tonight we're ready to laminate the 'furniture' pieces that are going beck into the v-berth area. Then I'll have a suitable platform to work from for the 'toe-rail' job. yeeeh...
    Attached Images    

  6. #6
    Join Date
    Sep 2001
    Location
    Northern MN
    Posts
    1,100
    Everybody seems to be dealing with the heat, so I'll spare you the whinning. but 90+ degrees and 70%+ humidity make hand sanding and shaping a little more messy. I've just finished off my first seven gallons of epoxy and I think I've sanded away at least four gallons worth

    found some time the other morning to cut holes for the dorade vents. The cabin top here was a full 3/4" thick. Cool.
    Attached Images    

  7. #7
    Join Date
    Sep 2001
    Location
    Northern MN
    Posts
    1,100
    Because of the lack of room and, more importantly, the fact that I only had a 52" stick of teak left, we made a modified dorade box. It will still drain through weap holes but the air will have to go around a baffle. Such is life. I'll deal with it...

    What really stinks is my boring bit/countersink and plug cutter are two different sizes. I had enough scrap to cut ten plugs. Plan D
    Attached Images  

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts