+ Reply to Thread
Page 10 of 11 FirstFirst 1 2 3 4 5 6 7 8 9 10 11 LastLast
Results 136 to 150 of 160

Thread: A-231 Periwinkle

  1. #136
    Join Date
    Jan 2004
    Location
    Scarborough, Maine
    Posts
    1,439
    Quote Originally Posted by bill@ariel231 View Post
    Periwinkle made her first trip off the dock on last saturday (apr 19th). not to many boats in the water yet at the marina...
    Congrats Bill, and well done! 3 weeks to launch up here, and way too much to do!
    Mike
    Totoro (Sea Sprite 23 #626)

  2. #137
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    Thanks Mike..

    hope we see some pictures of Sea Glass soon. This should be an easy pre-season for A-414 with new decks and hardware installed last year.

    cheers
    bill@ariel231
    Last edited by bill@ariel231; 04-25-2008 at 06:23 AM.

  3. #138
    Join Date
    Jan 2004
    Location
    Scarborough, Maine
    Posts
    1,439
    Quote Originally Posted by bill@ariel231 View Post
    This should be an easy pre-season for A-414 with new decks and hardware installed last year.
    Heh! I've calculated my weekend days to launch, and I'm down to 6 (-2 for Mom's Day and a Red Sox game). BTW, someone should switch Father's and Mother's Day so Dads can work guilt-free on their boats during "their day"...

    Anyway, that leaves only 4 days between birthday parties, swimming lessons, yard work and whatever else may come up to deter my commissioning. Yikes!

    BTW, how do you clean your non-skid?
    Mike
    Totoro (Sea Sprite 23 #626)

  4. #139
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    your plate's full... have fun at Fenway!

    i've found the non-skid cleans up with boat soap and aggressive scrubbing with a brush.
    Last edited by bill@ariel231; 04-25-2008 at 06:59 AM.

  5. #140
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    sorry to see the season ended with only a hand full of trips this year...
    Attached Images  

  6. #141
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    time to get the cover installed...
    Attached Images  

  7. #142
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    first is the frame (mostly 1/2" pvc conduit)...
    Attached Images  
    Last edited by bill@ariel231; 12-12-2008 at 07:22 PM.

  8. #143
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    then the canvas...
    Attached Images  
    Last edited by bill@ariel231; 11-15-2008 at 12:19 PM.

  9. #144
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    hopefully it will stay nice and dry on the inside...
    Attached Images  

  10. #145
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    plenty of time over the winter to start on projects like a more elegant rail bracket for the radar pole ...
    Attached Images  
    Last edited by bill@ariel231; 11-15-2008 at 12:12 PM.

  11. #146
    Join Date
    Nov 2002
    Location
    Lutherville, Maryland (near Baltimore)
    Posts
    197
    Bill,
    Have you detailed how your cover is built and fastened elsewhere? If you haven't I'd appreciate it if you would. Nice work.

  12. #147
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    no problem. The bulk of the canvas is a 16'x20' rectangle modified with a 9' cut on the centerline. The white strip sewn into the cut is a length of old sail cloth stitched in to add a line of grommets. Amidship, both sides have three 16" slots sewn in to the cover to clear the standing rigging. The other pieces of canvas are a 12x12 and a 12x16 that overlap on the boom and cover the cockpit to the stern.

    the frame material consists of 1/2" schedule 40 pvc conduit (sold in 10' lengths). The hoops bent in place and insert into the stanchion sockets on the deck (each is 8-10 foot and are cut to allow for contact with the ridge pole (aka the boom and an 10' length of 1.5" conduit over the fore deck). for my boat there are three hoops cut to fit the stanchion sockets and two more secured to the pulpit and stern rails. The four fore-aft lengths are each glued up to a length of 25'. These are secured to the hoops with wire ties during assembly and lashed in place once the frame is assembled.
    Last edited by bill@ariel231; 12-12-2008 at 07:23 PM.

  13. #148
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    We finally got Periwinkle off the dock last weekend. Still plenty of spring projects to finish. That clump of trees to starboard is "Mount Hope", I don't know why it got that name (http://en.wikipedia.org/wiki/Mount_Hope,_(Rhode_Island)), the highest point in the state is Jerimoth Hill (about 800' higher).
    Attached Images  
    Last edited by bill@ariel231; 06-03-2009 at 05:30 AM.

  14. #149
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    good grief i has been a while since we posted anything on periwinkle. so some pictures from our last couple trips off the dock are in order.

    A couple weekends back, Alyce and I were amused when we crossed paths with neighboors from the marina in their CD28.
    Attached Images  
    Last edited by bill@ariel231; 08-22-2011 at 07:36 PM.

  15. #150
    Join Date
    Nov 2005
    Location
    Narragansett Bay, R.I.
    Posts
    597
    i've been told it that when two or more boats are gathered you have a race .

    so out with the reef....
    Attached Images  
    Last edited by bill@ariel231; 08-22-2011 at 07:15 PM.

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts