The (take it in the) short(s) list...
Does anyone remember how this all started? I found a little bit of rot at the base of the main bulkhead. Okay, in reality I could peel the plys apart with a phillips screwdriver and not much effort. So just like 10 years ago, one single event precipitates a whole sequence of events, or, changes in this case.
Without turning a blind eye to what I've known for some time, this is what I feel has to happen.
1) Raise the remains of the v-berth to both widen the sleeping platform and increase storage. Then add a filler piece, which will make using the head an exorcise if using the v-berth for, I dunno, sleeping.
2)Excise the plastic water tank. I never tested it for leaks, it's all my water eggs in one basket, has no baffles. Make 2 smaller integral water tanks and still have room left over for storage.
3)The platform reserved for the head needs to be lowered just incase I have a windfall and get a composter. But incase not, build an integral or 'fits like a glove' holding tank.
4)Re-reconstruct the starboard storage in the main salon to allow my feet to fit under the cabinets with a mattress underneath when sleeping athwartships. This one really hurts but I think the louvered doors will work up front in the v-berth after the changes come about.
Those are the wrinkles that I feel absolutely need to be addressed. But it is not inconcievable that something in the main cabin and galley area might need attention too. Like sub-sole storage to name one. Well, what's another 10gallons of epoxy among friends. Right?